top of page
Search
Writer's pictureJames O'Callaghan

Topped Out!

The team from DMR ‘Topped Out’ the steel this week, all lined and levelled and ready for the timber framing to start. They have done a great job and have acted in a very professional manner throughout the steel frame erection. In fact they have done such an efficient job that I am regretting not having made the remaining upper level out of steel rather than the timber that it is planned to be. Hindsight is a painful teacher someti

Steel frame topped out, complete, Fairhaven steel frame, slender columns
Island Rest Steel Frame Complete

mes..

35 views0 comments

Recent Posts

See All

コメント


Post: Blog2_Post
bottom of page